Monday, June 29, 2009

Turbines are Staying Put

If you were hoping to get a look at one of the two huge turbines destined for Point Lepreau today, it's not going to happen. The original plan to load one of the refitted turbines onto a barge and then to Point Lepreau has been delayed due to the rain and wind. They arrived back from the UK two weeks ago after a refit when they were dropped into the Harbor last fall.

Spokes-person Heather McLean tells CHSJ News, they hope to get the piece of machinery loaded onto the barge tomorrow and the second turbine before the week is over.

No comments:

Post a Comment