Work on the Peter Murray Arena will get underway this summer. Erbs Enterprises has been awarded the contract to supply and install new pre-fabricated boards and spectator sheilding. The cost of the replacement is 188 thousand dollars. The existing boards are in a deteriorated condition.
No comments:
Post a Comment