NB Power releasing some of last month's operating highlights for the Point Lepreau Generating Station.
Point Lepreau is operating at a 100% power, putting more than 600 megawatts on the provincial grid. The station producing almost half of the electricity from NB Power generating stations for the month of December. As of today they've been online for 64 days in a row.
NB Power says the station is now getting ready for a planned maintenance outage scheduled to start this Spring.