Linked Header

Friday, April 29, 2011

Point Lepreau Refurbishments Move Forward


Finally some good news for Point Lepreau.  Atomic Energy of Canada Limited has successfully installed 20 per cent of the calandria tubes in the plant's nuclear reactor. 

NB Power President Gaetean Thomas says the next step will be to install pressure tubes that go inside of the calandria tubes.

The newly installed calandria tubes all passed the necessary leak tests and Thomas says AECL is currently on schedule to be done by the fall of 2012.