The Department of Transportation advises that the Saint John Harbour Bridge eastbound right lane and Chesley Drive exit ramp will be closed until 3 p.m. today, Wednesday, June 8th.
The eastbound left side lane will be closed between 9 a.m. and 3 p.m. on June 10th and 11th.
The Chesley Drive exit ramp will be closed from 9 a.m. on June 11th until late September 2011.
The Westbound lanes and the Chelsey Drive on ramp will be closed from 8 a.m. on June 11th for about three weeks.
These temporary measures are in place due to the work of the second phase of renovation of the bridge.
Drivers are reminded to exercise caution while these temporary measures are in place.