Quispamsis getting it's feet wet helping Rothesay with it's flooding problems.
Mayor Murray Driscoll tells CHSJ news they've spent a $50,000 on consultants to do a study that's shown there's other options than building a retention pond just off Pettingill Road.
The town is ready to commit over $1.25 million in moving forward on a lift station, as long as it's in a higher location. But if the retention pond is by Pettingill Road, the low level could lead to flooding in Quispamsis.
Driscoll adds they're in the design stage and expect to move forward and work with Rothesay until the flooding is resolved.