The Chipman Hill portion of the Pedway will be getting some major repairs in the near future.
Uptown dwellers might remember the late January wind storm that loosened the glass wall in the middle of the daily lunch rush. After that episode, the section of the indoor connection had to undergo some temporary repairs.
Now, the City has issued a call for tenders until September 4 for the replacement of the curtain wall. They stipulate it would ideally be finished by the end of October.
The pedway was originally built in the early 1980s and is Atlantic Canada's longest indoor, climate-controlled pedway system.